Marine Parkway – Gil Hodges Memorial Bridge
BIM & Temporary Works Engineering
UrbanTech Consulting Engineering provided BIM coordination and temporary works structural engineering for the Marine Parkway – Gil Hodges Memorial Bridge as part of the MTA’s MP-09 Design-Build program. Working with Kiewit Engineering, UrbanTech supported critical elevator, span lock, and barrier gate rehabilitation on this active NYC movable bridge.
BIM & Digital Coordination
Developed a project-specific BIM Execution Plan
Performed LiDAR scanning to capture accurate existing conditions
Built and coordinated LOD 400 BIM models for proposed work
Led clash detection at key design milestones
Delivered a coordinated as-built BIM model
Temporary Works Engineering
Designed suspended scaffold anchorage systems
Engineered temporary supports for barrier gates
Designed material staging platforms within bridge towers
Performed peer reviews of protective shielding and access platforms
UrbanTech’s integrated BIM and temporary works expertise helped reduce construction risk, improve safety, and support efficient construction sequencing while keeping this critical transportation link operational.